| |
Works Catalogue
Hotels
From the hotels of classic design architecture to the most avant garded; from the leisure sector hotel to the business one, in Enermes we have a consolidated experience on the hotel sector and refurbishment. In any case, we bet on innovation and technology in our installations searching always the highest client satisfaction.
|
Hotel H10 Estepona Palace |
|
| Localization |
Malaga |
| Client |
Maresto S.A. |
| Actuation |
Project redaction, conditioning, garage extraction, plumbing, drainage and fire figthing |
| Description |
4 stars hotel, situated at beaches front line with 181 rooms and 7 junior suites. Total conditioning power installed 822KW |
| Total Budget |
1.610.750 € |
|
Alanda NH Hotel, “Milla de Oro” |
|
| Localization |
Marbella |
| Client |
Edificaciones Tifan S.A. |
| Actuation |
Conditioning – heting of this hotel, situated on Costa del Sol’s Heart in the well known “Milla de Oro” (Golden Mile) between Marbella and Puerto Banus |
| Total Budget |
1.775.000 € |
|
Islantilla Golf Resort Hotel |
|
| Localization |
Isla Cristina-Huelva |
| Client |
Islantilla golf resort S.L. (Grupo Avanco) |
| Actuation |
Conditioning |
| Total Budget |
1.000.000 € |
|
NH Parla Hotel |
|
| Localization |
Parla - Madrid |
| Client |
Construcciones Edisan S.A. |
| Actuation |
Conditioning |
| Description |
414KW cold power. 680KW heat power. 4 tubes fan coil systems in the rooms. Common zones treated by 4 tubes conditioners with their corresponding exterior air contributions. |
| Total Budget |
763.000 € |
|
Alcala de Henares NH Hotel |
|
| Localization |
Madrid |
| Client |
Construcciones Edisán, S.A. |
| Actuation |
Air conditioning, DHW and fire figthing |
| Total Budget |
296.257 € |
|
Arganda NH Hotel |
|
| Localization |
Madrid |
| Client |
Edificaciones Tifán, S.A. |
| Actuation |
Air conditioning, DHW and fire figthing |
| Total Budget |
787.000 € |
|
|