| |
Works Catalogue
Others
Comercial and leisure centres, unifamiliar houses, office buildings, military infrastructures, congress & trade fair palaces, airports, penitentiary centers, educatives & sportive, railway infrastructure, geriatric residentials, hystoric-Artistic heritage buildings, big parkings, radio television buidings, different institutional buildings for public administrations, etc. are some of our best clients. Although many and different, we study and proyect indibidually the most appropriate installation to each necessity, having in mind cost and time parameters, quality, environment and security.
|
Congres and Fair Trade Palace, Malaga |
|
| Client |
Necso, Entrecanales y Cubiertas, S.A. |
| Actuation |
Project redaction, conditioning - extraction |
| Description |
Building characterized for having an irregular form simulating ocean waves with titanium structure with fish shape offices. Total conditioning power installed of 4,852KW (4.8MW) |
| Total Budget |
3.362.000 € |
|
Congress & Exposition Palace of Aguadulce |
|
| Client |
Jarquil Andalucía, S.A. |
| Actuation |
Project redaction, conditioning - extraction |
| Description |
Placed in Aguadulce, Almeria. Is a modern building which receives all types of expositions in which needs to be emphasized the “Feria Hortofruticola Internacional de los Cultivos Intensivos (EXPO AGRO)”. (International Fruit & Vegetable Procesing Fair of Intensive Farming). More than 5,500m2 were conditioned which are added to the 12,500m2 already existent. 1,122KW Conditioning power installed. |
| Total Budget |
781.315 € |
|
Malaga Airport’s Control Tower |
|
| Client |
FCC Construcción, S.A. |
| Actuation |
Conditioning – ventilation |
| Description |
Control tower with spectacular design with latest equipment and most advanced technology which improves service quality on aerodrome’s and approximations control. |
| Total Budget |
570.000 € |
|
Madrid Train Station Chamartin |
|
| Client |
RENFE UN de Estaciones |
| Actuation |
Replacement of hot and cold water system |
| Description |
Total power installed 3,600KW cold and 5,600 KW hot. Total 9,200KW. Replacement of conditioning production equipment and DHW. New machine room and structure on stations roof. |
| Total Budget |
1.000.000 € |
|
Regional education and science ministry of Castilla la Mancha boards (Toledo) |
|
| Client |
Necso, Entrecanales y Cubiertas, S.A |
| Actuation |
Conditioning, extraction and solar energy |
| Description |
790m2 solar radiation captation surface |
| Total Budget |
1.819.000 € |
|
“Las Rozas Building” – Montaña (Madrid) |
|
| Client |
Ferrovial Agromán, S.A. |
| Actuation |
Conditioning – Ventilation |
| Description |
The installation supplies to 2 buildings with hot & cold independient water production systems. |
| Total Budget |
1.800.000 € |
|
Marques de Salamanca Building |
|
| Client |
Promotorauno, S.A. |
| Actuation |
Conditioning, extraction |
| Description |
Emblematic building in the well known avenue of Ricardo soriano in the Marbella’s borough. |
| Total Budget |
347.000 € |
|
Professional troops building. Naval base of rota (Cadiz) |
|
| Client |
Military Service of Construction. Ministry of Defence. |
| Actuation |
Conditioning, ventilation, solar energy. |
| Description |
Conditioning, ventilation, solar capture system and centralized management control system in the proffesional troops building. Naval Base of Rota. |
| Total Budget |
668.238 € |
|
|